STEEL DECK
Deck requirements should be precise before price becomes the only conversation.
Roof, composite, cellular and specialty deck requirements structured around profile, depth, gauge, coating, length, quantity, accessories, drawings and delivery basis.
WHAT TO SEND
Start with the current buying basis.
If some information is missing, send the current set anyway. Missing facts can be identified explicitly rather than hidden inside the price.
✓Structural / architectural drawings
✓Deck type, profile and depth
✓Gauge and coating / finish
✓Lengths or cut list
✓Square footage and accessories
✓Required-on-site date
EXECUTION CONTROLS
Keep the requirement usable as it moves.
Price only matters if the quoted basis still matches what the project actually needs.
01Profile and gauge confirmation
02G90 / galvanized / painted basis
03Cut-to-length assumptions
04Edge trim, closure and pour-stop scope
05Revision / release sequence
CONNECTED CAPABILITIES
Do not restart the requirement at every boundary.
Steel Deck requirement?
Drawings, material lists and incomplete RFQs are acceptable starting points.
Send Requirement