STEEL TAKEOFFS
Turn drawings into a buying scope before the buying scope turns into confusion.
Takeoff support can help identify products, quantities, member schedules and missing information from the current drawing set so the commercial package is structured earlier.
CONTROL FLOW
Turn fragmented information into a decision basis.
01
Current set
Confirm the governing structural / architectural revision.
02
Material extraction
Identify relevant members, deck areas, joists, miscellaneous and accessory scope.
03
Scope normalization
Organize quantities into a commercial format that can be reviewed and priced.
04
Exception list
Call out ambiguities, missing schedules, conflicts and assumptions requiring resolution.
CONTROL PRINCIPLES
Precision without invented certainty.
Takeoff output is only as current as the drawing revision.
Assumptions should be visible, not buried.
Quantities should preserve product/specification distinctions.
Changes should trigger revision comparison, not silent overwrite.
Send the current files and requirement.
Trillick can identify what is known, what is missing and what needs to be controlled next.
Send Requirement