STEEL JOISTS + GIRDERS
Joists require more than a count and a span.
K, KCS, LH, DLH, joist girders and bridging organized around loads, geometry, bearing, spacing, bridging, openings, drawings, submittals and the project release sequence.
WHAT TO SEND
Start with the current buying basis.
If some information is missing, send the current set anyway. Missing facts can be identified explicitly rather than hidden inside the price.
✓Structural drawings and joist schedule
✓Joist marks, spans and quantities
✓Design loads and special loads
✓Bearing / seat conditions
✓Bridging and openings
✓Required shop / release dates
EXECUTION CONTROLS
Keep the requirement usable as it moves.
Price only matters if the quoted basis still matches what the project actually needs.
01Schedule-to-drawing reconciliation
02Design-load completeness
03Special geometry / openings
04Shop drawing approval state
05Production and delivery release basis
CONNECTED CAPABILITIES
Do not restart the requirement at every boundary.
Steel Joists requirement?
Drawings, material lists and incomplete RFQs are acceptable starting points.
Send Requirement